Run: 2026-05-03__007__repo-consolidation-one-repo · Date: 2026-05-03 evening PT · Format: JOURNAL_STANDARDS v1.1
Plan delivered: one-repo-with-tightly-defined-folders is correct shape. Timing/calendar gating added by quarterback before ship.
Reviewed mission-state context, current 4-repo topology, and target monorepo layout. Built proposed structure (engine/apps/skills) with named risks for each fold.
Plan was timing-silent on first pass — needed quarterback's calendar overlay to become operationally safe. [upgrade-signal:gap] Add 'Calendar — what happens when' as required element of every infra plan.
Now requires every infra-change plan to include a calendar/risk-gate table, not just file ops.
Generated from 007__architect.md — do not edit this HTML directly.